logo



Tender Title Publication Date&Time Closing Date&Time Details

Addendum-02 of Bids for Procurement of Design, Supply, and Installation of Haripur 100 MW Liquid Fuel Power Plant on Turnkey Basis.

09th Nov 2017 17:30:00 30th Nov 2017 12:00:00 Details

Corrigendum-02 of Bids for Procurement of Design, Supply, and Installation of Haripur 100 MW Liquid Fuel Power Plant on Turnkey Basis.

09th Nov 2017 17:30:00 30th Nov 2017 12:00:00 Details

Procurement of Consumable goods and other electrical spares of Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd.

09th Nov 2017 11:00:00 29th Nov 2017 15:00:00 E-GP Link

Corrigendum-01 of Bids for Procurement of Design, Supply, and Installation of Haripur 100 MW Liquid Fuel Power Plant on Turnkey Basis.

26th Oct 2017 16:00:00 30th Nov 2017 12:00:00 Details

Addendum-01 of Bids for Procurement of Design, Supply, and Installation of Haripur 100 MW Liquid Fuel Power Plant on Turnkey Basis.

26th Oct 2017 16:00:00 30th Nov 2017 12:00:00 Details

Minutes of Pre-Bid Meeting of Bids for Procurement of Design, Supply, and Installation of Haripur 100 MW Liquid Fuel Power Plant on Turnkey Basis.

26th Oct 2017 16:00:00 30th Nov 2017 12:00:00 Details

Supply Installation and Maintenance Support Service of Dedicated Data Connectivity Bandwidth BW Line & Wireless Communication for Redundant Data Connectivity and Dedicated Internet Bandwidth for DMZ among Data Centre Corporate Office Siddhirganj 2x120

24th Oct 2017 17:00:00 08th Nov 2017 17:00:00 E-GP Link

Procurement of C & F agent service for execution of LTSA of Haripur 412 MW CCPP. All activities related to clearing and forwarding of Goods (Parts of Gas Turbine of Haripur 412 MW Combined Cycle Power Plant) from any port of Bangladesh. The Goods will be

23rd Oct 2017 22:00:00 07th Nov 2017 12:00:00 E-GP Link

Civil Maintenance Works (Painting of residential building, Construction supports of gate-1, supports of Gas pipe line and Chiller shade, Sheet pile area and bath room repair works) of Siddhirgonj 2 x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Nara

19th Oct 2017 12:00:00 06th Nov 2017 12:00:00 E-GP Link

Procurement of Land Demarcation 999.65 Acres for Land Acquisition of 100 MW Solar & 100 MW Wind Power Plant Project at Sonagazi, Feni of EGCB Ltd.

15th Oct 2017 17:00:00 31st Oct 2017 12:00:00 E-GP Link

Procurement of Instrument Air compressor spares with related services of Siddhirganj 2X120 MW Peaking Power Plant, Siddhirganj, Narayanganj,EGCB Ltd.

15th Oct 2017 11:00:00 30th Oct 2017 12:30:00 E-GP Link

Procurement of Instrument Air compressor spares with related services of Siddhirganj 2X120 MW Peaking Power Plant, Siddhirganj, Narayanganj,EGCB Ltd.

15th Oct 2017 11:00:00 30th Oct 2017 12:30:00 E-GP Link

Procurement of different heat exchanger gasket for Haripur 412 MW CCPP EGCB Ltd.

11th Oct 2017 17:50:00 30th Oct 2017 12:00:00 E-GP Link

Procurement of labour for sludge removal works of Haripur 412 MW CCPP EGCB Ltd.

02nd Oct 2017 16:30:00 17th Oct 2017 12:00:00 E-GP Link

Procurement of Microfilter & accessories for Water Treatment Plant of Haripur 412 MW CCPP EGCB Ltd.

02nd Oct 2017 16:00:00 19th Oct 2017 12:00:00 E-GP Link

Supply and lnstallation of Split Type Air Gonditioner for NOC Room for corporate office of EGCB Ltd.

02nd Oct 2017 12:00:00 12th Oct 2017 12:00:00 Details

Purchase of Spares for Ultra Violet (UV) Flame Detection System, Combustible Gas Detection System and Fire Detection System, Portable Gas Detector for Gas Leaks detection and Portable Multi Gas Analyzer for Combustion & Emission Testing & others I&C Spare

02nd Oct 2017 10:00:00 26th Oct 2017 11:30:00 E-GP Link

Procurement of plumbing & sanitary materials civil material etc. for Haripur 412 MW CCPP EGCB Ltd.

27th Sep 2017 16:30:00 12th Oct 2017 12:00:00 E-GP Link

Bids for Procurement of Design, Supply, and Installation of Haripur 100 MW Liquid Fuel Power Plant on Turnkey Basis.

27th Sep 2017 16:00:00 30th Nov 2017 12:00:00 Details

Procurement of Air Conditioner, Chiller and Switchgear Room Blower Servicing under annual maintenance contract of Siddhirganj 2x120MW Peaking Power Plant, ECCB Ltd.

25th Sep 2017 15:00:00 10th Oct 2017 14:30:00 E-GP Link

Procurement of different types of bearing for Motor, Pump, Fan, etc. of Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd.

25th Sep 2017 15:00:00 11th Oct 2017 14:30:00 E-GP Link

Procurement of Sweeping, Cleaning & Gardening works at Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayangani.

25th Sep 2017 12:00:00 11th Oct 2017 15:00:00 E-GP Link

Procurement of different types of Filters for Siddhirgalj 2x120 MW Peaking Power Plant, ECCB Ltd. Siddhirganj, Narayanganj.

24th Sep 2017 12:00:00 11th Oct 2017 12:00:00 E-GP Link

Procurement of Consumables for Mechanical Maintenance Department of Siddhirganj 2x120 MW Peaking Power Plant. EGCB Ltd., Siddhirganj, Narayanganj.

24th Sep 2017 12:00:00 12th Oct 2017 12:00:00 E-GP Link

Procurement of I&C Spares for Instrument Air Compressor and Water Treatment System of Haripur 412 MW Combined Cycle Power Plant.

07th Sep 2017 10:00:00 23rd Oct 2017 12:00:00 Details

Corrigendum -1 : Procurement of I&C Spares for Instrument Air Compressor and Water Treatment System of Haripur 412 MW CCPP Plant, EGCB Ltd.

07th Sep 2017 10:00:00 30th Oct 2017 12:00:00 Details

Procurement of PLC control cards with installation services for different control system and various field/control spares for fuel gas compressor of Haripur 412 MW CCPP

24th Aug 2017 09:53:00 09th Oct 2017 12:00:00 Details

RFQ for Printing and Supply of five hundred (500) pieces of Annual Report with Envelope for Electricity Generation Company of Bangladesh Limited

06th Aug 2017 16:00:00 10th Aug 2017 17:00:00 Details

EOI for selection of Individual Consultant (National) (Lump-sum Based) for Consultancy Services for Developing, lmplementing & Maintaining Integrated Management System (lSO 9001, ISO 14001& BS OHSAS 18001/lSO 45001) for EGCB Ltd.

01st Aug 2017 16:47:00 16th Aug 2017 12:00:00 Details

Procurement of Annual Maintenance and Support Services for Tally Software of Electricity Generation Company of Bangladesh Limited.

27th Jul 2017 17:00:00 01st Aug 2017 17:00:00 Details

Procurement of Main I&C Spares (Control Card.Modules) for DCS (Distributed Control System) and CMS (Condition Monitoring System) of Haripur 412 MW Combined Cycle Power Plant.

15th Jun 2017 12:00:00 31st Jul 2017 12:00:00 Details

Procurement of 07 (Seven) Laptop Computers for Siddhirganj 335 MW CCPP Project, EGCB Limited, Siddhirganj, Narayanganj.

14th Jun 2017 10:30:00 06th Jul 2017 13:00:00 E-GP Link

Supply of Skilled labour (for Carrying different solid & liquid chemicals etc.) for water treatment plant of Haripur 412 MW CCPP, EGCB Ltd., Haripur, Bandar, Narayanganj.

29th May 2017 17:00:00 13th Jun 2017 12:00:00 E-GP Link

Procurement of Transformer Oil

25th May 2017 11:00:00 12th Jun 2017 12:00:00 E-GP Link

Procurement of pipe fittings,elbow, full coupling ,support,shafts, small valves, flange, nut bolts, potable pump etc for Haripur 412 MW CCPP, EGCB Ltd., Narayangnaj.Haripur 412 MW CCPP Narayanganj

24th May 2017 20:00:00 13th Jun 2017 12:00:00 E-GP Link

Procurement of sweeping and cleaning for Haripur 412 MW CCPP, EGCB Ltd. Narayangonj

23rd May 2017 18:00:00 07th Jun 2017 12:00:00 E-GP Link

Procurement of Control Cards and Modules for different control systems of Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Narayanganj, Bangladesh

23rd May 2017 10:00:00 06th Jul 2017 12:00:00 Details

Procurement of Lube oil, Control oil, Hydraulic oil,gear oil etc for Haripur 412 MW CCPP, EGCB Ltd., Narayanganj.

15th May 2017 18:00:00 31st May 2017 12:00:00 E-GP Link

Procurement of pipe fittings,elbow, full coupling ,support,shafts, small valves, flange, nut bolts, potable pump etc for Haripur 412 MW CCPP, EGCB Ltd., Narayangnaj.Haripur 412 MW CCPP Narayanganj

14th May 2017 20:00:00 13th Jun 2017 12:00:00 E-GP Link

Procurement of spares for Cooling tower for Haripur 412 MW CCPP

14th May 2017 18:00:00 08th Jun 2017 12:00:00 E-GP Link

Procurement of I&C Spares for AUMA Motor Operated Actuators of Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Narayanganj, Bangladesh

09th May 2017 11:00:00 21st Jun 2017 15:00:00 Details

Procurement of testing Chemicals and testing Equipment (kits) for WTP Laboratory for Haripur 412 MW CCPP.

08th May 2017 17:00:00 29th May 2017 12:00:00 E-GP Link

Procurement of reverse osmosis (RO) Membrane & its accessories for water treatment plant of Haripur 412 MW CCPP.

03rd May 2017 20:00:00 25th May 2017 12:00:00 E-GP Link

Procurement of Valves Spares for ST, GBC,WT,WWT and GT for Haripur 412 MW CCPP

03rd May 2017 20:00:00 24th May 2017 12:30:00 E-GP Link

Procurement of spares for General service pumps for Haripur 412 MW CCPP

02nd May 2017 16:00:00 22nd May 2017 12:00:00 E-GP Link

Procurement Pumps, pump spares, Blowers spares etc. of WT and WWT for Haripur 412 MW CCPP

26th Apr 2017 18:00:00 22nd May 2017 12:00:00 E-GP Link

Procurement of AC Spares of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

26th Apr 2017 13:00:00 11th May 2017 12:30:00 E-GP Link

Procurement of Supply and Installation of Exhaust Fan for Switchgear Room of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

26th Apr 2017 13:00:00 14th May 2017 15:00:00 E-GP Link

Procurement of Spares of Switchgear of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

26th Apr 2017 11:00:00 14th May 2017 13:30:00 E-GP Link

Purchase of Valve Solenoids for Gas Turbine (GT) & Balance of Plant (BOP) of Siddhirganj 2X120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.

23rd Apr 2017 10:00:00 22nd May 2017 12:00:00 E-GP Link

Procurement of AC Jacking Oil Motor and Circulating Water Motor of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

16th Apr 2017 14:30:00 07th May 2017 14:00:00 E-GP Link

Procurement of Spares of 125V/ 150A Battery Charger of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

16th Apr 2017 14:30:00 07th May 2017 15:30:00 E-GP Link

Procurement of Motor Servicing Works under annual maintenance contract of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

16th Apr 2017 09:25:00 14th May 2017 15:00:00 E-GP Link

Procurement of Pumps, pump spares of CT and HRSG etc. for Haripur 412 MW CCPP, EGCB Ltd.,Narayanganj, Bangladesh

10th Apr 2017 18:00:00 02nd May 2017 12:00:00 E-GP Link

Procurement of Photocopier Machine for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj

05th Apr 2017 10:00:00 20th Apr 2017 12:00:00 E-GP Link

Procurement of Fire Fighting Pipeline Fitting GT Expansion Joint bolts, Turbine Bleed line clamp, TK fan pipeline flexible rubber joint and other fittings.

30th Mar 2017 11:28:00 16th Apr 2017 12:00:00 E-GP Link

Procurement of Belt, Rubber O-Ring, Rubber Bucket etc. for Siddhirganj 2X120 MW Peaking Power Plant, Siddhirganj, Narayanganj.

29th Mar 2017 22:00:00 16th Apr 2017 12:00:00 E-GP Link

Procurement of Liveries/Uniform (Jacket, Shirt, Pant) for the employee of Siddirganj 2x12A MW Peaking Power Plant

29th Mar 2017 10:00:00 16th Apr 2017 11:00:00 E-GP Link

Procurement of Construction works of Rack and Almirah for store of Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd.

28th Mar 2017 23:00:00 12th Apr 2017 12:00:00 E-GP Link

Supply of skilled, semi skilled & helper labor for GT CI of Haripur 412MW CCPP

28th Mar 2017 22:00:00 12th Apr 2017 12:00:00 E-GP Link

Procurement of Cylinder and other related accessories for CO2 Flooding System for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirgang, Narayanganj, Bangladesh.

28th Mar 2017 10:00:00 16th Apr 2017 12:00:00 E-GP Link

Procurement of repairing works GT#01 & GT#02 Area, GT#02 cooling water pump line support installation works, Security house floor repairing works, Main gate support fixing works, residential building maintenance works and construction of 04 sets brick pil

27th Mar 2017 23:00:00 11th Apr 2017 12:00:00 E-GP Link

Purchase of CCTV System, other accessories and related services for Installation, Testing & Commissioning of CCTV Surveillance system for Siddhirganj 2x120 MW Peaking Power Plant. ECCB Ltd. . Siddliirganj, Narayanganj, Bangladesh.

23rd Mar 2017 10:00:00 10th May 2017 12:00:00 E-GP Link

Procurement of plumbing and sanitary equipment for Siddhirganj 2X120 MW Peaking Power Plant, Siddhirganj, Narayanganj.

22nd Mar 2017 23:30:00 10th Apr 2017 12:00:00 E-GP Link

Procurement of Painting works for main gas pipeline, overhead crane structue, firefighting pipeline & gate- 1, 2 & 3 for Siddhirganj 2X120 MW Peaking Power Plant. Siddhirganj, Narayanganj

22nd Mar 2017 22:00:00 09th Apr 2017 12:00:00 E-GP Link

Procurement of dress for Security and O&M Personnel of Haripur 412 MW Combined Cycle Power Plant.

22nd Mar 2017 15:00:00 10th Apr 2017 12:00:00 E-GP Link

Procurement of safety items, rain coat etc. for MMD of Haripur 412 MW CCPP

20th Mar 2017 17:00:00 06th Apr 2017 12:00:00 E-GP Link

Procurement of filters(coalsec filter, Nitrogen membrane etc.) for different equipment of Haripur 412 MW CCPP, Narayanganj.

14th Mar 2017 18:00:00 30th Mar 2017 12:00:00 E-GP Link

REOI for Selection of Individual Consultants for consultancy services for technical and strategic support for the implementation of an Enterprise Resource Planning (ERP) & Enterprise Asset Management (EAM) System at the level corporate and all of the ente

06th Mar 2017 12:00:00 30th Mar 2017 15:00:00 Details

Supply of Gas Turbine Compressor Washing Detergent for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj. Narayanganj.

05th Mar 2017 23:30:00 20th Mar 2017 11:30:00 E-GP Link

Procurement of closed cooling water (CCW) heat exchanger gasket for Haripur 412 MW CCPP, EGCB Ltd., Narayanganj.

05th Mar 2017 17:00:00 21st Mar 2017 12:00:00 E-GP Link

Supply of Skilled labour (for Carrying different solid & liquid chemicals etc.) for water treatment plant of Haripur 412 MW CCPP, EGCB Ltd., Haripur, Bandar, Narayanganj.

01st Mar 2017 22:00:00 21st Mar 2017 12:00:00 E-GP Link

Procurement of Electrical tools and tackles of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

01st Mar 2017 15:00:00 16th Mar 2017 14:50:00 E-GP Link

Procurement of Furniture of Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd.

01st Mar 2017 12:00:00 16th Mar 2017 13:55:00 E-GP Link

Procurement of Wireless Microphone System for Conference Room for Corporate Office of EGCB Ltd.

01st Mar 2017 12:00:00 21st Mar 2017 12:00:00 E-GP Link

Procurement of Safety Items and Security Equipments for Siddhirganj 2X120 MW Peaking Power Plant, Siddhirganj, Narayanganj

01st Mar 2017 10:00:00 16th Mar 2017 11:30:00 E-GP Link

Procurement of Valves for Chiller, Firefighting system, IA Compressor and CW module of Siddhirganj 2X120 MW Peaking Power Plant, Siddhirganj, Narayanganj.

28th Feb 2017 23:00:00 15th Mar 2017 11:30:00 E-GP Link

Selection of "Individual Consultant" [Financial Consultant] for 6 man-month for consultancy services to prepare '10 Years Business Plan' of Electricity Generation Company of Bangladesh Ltd.

12th Feb 2017 12:00:00 05th Mar 2017 17:00:00 Details

Procurement of I&C spares (Field Instrument, Transmitter, Analyzer kit and accessories for HRSG, BOP and SWAS ) for Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Narayanganj, Bangladesh (The addendum is also enclosed here)

08th Feb 2017 11:48:00 06th Apr 2017 12:00:00 Details

Procurement of I&C Spares for Control Valves of HRSG and Steam Turbine Bypass System of Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Narayanganj, Bangladesh

06th Feb 2017 11:51:00 20th Mar 2017 15:00:00 Details

RFQ for Procurement of Gas pipe line modification work for interconnection between GTCL RMS outlet and TGTDCL temporary RMS outlet for Haripur 412 MW CCPP, Narayanganj

31st Jan 2017 12:00:00 07th Feb 2017 12:00:00 Details

Procurement of filters (GT/ST lube oil, control oil, mist eliminator etc.) , auto drain trap etc. for Haripur 412 MW CCPP, Haripur, Bandar, Narayanganj.

25th Jan 2017 17:00:00 15th Feb 2017 12:00:00 E-GP Link

Procurement of Different types of Valve for Haripur 412MW CCPP.

18th Jan 2017 15:00:00 09th Feb 2017 12:00:00 E-GP Link

Procurement of Numerical Relay of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

15th Jan 2017 12:00:00 09th Feb 2017 11:50:00 E-GP Link

Procurement of spares for ST bypass system of Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd. Narayanganj, Bangladesh

12th Jan 2017 12:00:00 26th Feb 2017 15:00:00 Details

Procurement of Different Motor, pumps, Electrical Spares for Haripur 412 MW CCPP.

12th Jan 2017 11:00:00 31st Jan 2017 12:00:00 E-GP Link

Procurement of Interconnecting Cable for Mark-VI Control Panel of Siddhirganj 2×120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.

10th Jan 2017 12:00:00 22nd Feb 2017 15:00:00 Details

Sludge Removal works from Haripur 412 MW CCPP.

09th Jan 2017 16:00:00 24th Jan 2017 12:00:00 E-GP Link

Sweeping and cleaning works for Haripur 412 MW CCPP & residential area of Haripur 412 MW CCPP.

08th Jan 2017 16:00:00 23rd Jan 2017 12:00:00 E-GP Link

Pest Control, Rodent Control and Repelling of Snake device for Haripur 412 MW CCPP & Residential area of it.

04th Jan 2017 16:00:00 19th Jan 2017 12:00:00 E-GP Link

Procurement of different types of filters for mechanical maintenance division of Siddhirganj 2x120 MW Peaking Power Plant

03rd Jan 2017 23:00:00 18th Jan 2017 12:15:00 E-GP Link

Procurement of Activated media & Dual Media Filter element for Water Treatment plant of Siddhirganj 2x120 MW PPP

03rd Jan 2017 22:00:00 18th Jan 2017 12:15:00 E-GP Link

RFQ for Procurement of Income Tax Services for Electricity Generation Company of Bangladesh Limited

03rd Jan 2017 12:00:00 08th Jan 2017 17:00:00 Details

Procurement of Light Tools for Mechanical Maintenance Division of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj.

29th Dec 2016 23:00:00 15th Jan 2017 11:00:00 E-GP Link

Procurement of Consumables for Mechanical Maintenance Divison of siddhirganj 2x120 MW Peaking Power Plant

28th Dec 2016 15:00:00 12th Jan 2017 11:30:00 E-GP Link

Procurement of Consumables (Filters, V-belt) for HAVC for Haripur 412 MW CCPP.

27th Dec 2016 11:00:00 16th Jan 2017 12:00:00 E-GP Link

A corrigendum has been made to the Tender No-: 27.27 2666.103.03.004.2016.2350 dated 31 October 2016 for Proeurement of Industrial Air Filter (HEPA, Pre-1, Pre-2 and Washable filter) (H.S. Code- 8421.39.20) of GT Air Intake System for Haripur 412 MW CCPP

26th Dec 2016 15:00:00 12th Jan 2017 15:00:00 Details

Gas Turbine Primary Air Intake Filter Cleaning Work, GT Air Intake Filter replacement works and air intake filter house screen net replacement works

19th Dec 2016 22:00:00 09th Jan 2017 11:30:00 E-GP Link

Procuremnet of Consumable materials (Belt,net,paint,insulation, hose pipe,thinner, glue,molycote, grease,grinding disk, cutting disk,brush, o-ring,rubber sheet, klinger sheet,emery paper,packing, plastic water tank etc. ) for Haripur 412 MW CCPP

19th Dec 2016 16:00:00 05th Jan 2017 12:00:00 E-GP Link

Procurement of Electrical spares for plant and colony of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

19th Dec 2016 12:37:00 03rd Jan 2017 13:30:00 E-GP Link

Procurement of Street Light system spares of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

19th Dec 2016 12:00:00 03rd Jan 2017 11:30:00 E-GP Link

Procurement of IA/PA Compressor Power Cable of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

19th Dec 2016 11:12:00 03rd Jan 2017 12:45:00 E-GP Link

Procurement of DCS (Max DNA) Spares for Siddhirganj 2×120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.

15th Dec 2016 12:00:00 13th Feb 2017 15:00:00 Details

Procurement of Mechanical Spare Parts of Control Valve of HRSG for Haripur 412MW Combined Cycle Power Plant, EGCB Ltd., Narayanganj, Bangladesh.

15th Dec 2016 12:00:00 29th Jan 2017 15:00:00 Details

The corrigendum has been made to the Tender No.:27.27.2666.103.02.019.2016.2667, Date: 14 December 2016 for procurement of DCS (Max DNA) Spares for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh

15th Dec 2016 12:00:00 13th Feb 2017 15:00:00 Details

A corrigendum has been made to the Tender No.: 27 .27 .2666.103.03.004.2016.2350 dated 31 October 2016 for Procurement of Industrial Air Filter (HEPA, Pre-1, Pre-2 and Washable filter) (H.S. Code- 8421.39.20) of GT Air Intake System for Haripur 412 MW Com

08th Dec 2016 12:00:00 27th Dec 2016 15:00:00 Details

Physical service for different tests of transformer oil for Haripur 412 MW CCPP like DGA, Neutralization Test, Power dissipation factor, Resistivity, Specific gravity etc.

06th Dec 2016 12:00:00 22nd Dec 2016 12:00:00 E-GP Link

Procurement A polymer,C Polymer, Corrosion & Scale inhibitor, ammonia, hydrazine, salt, PAC,RO Antiscalant, SBS etc. for Haripur 412 MW CCPP, Narayanganj, Bangladesh.

04th Dec 2016 18:00:00 02nd Jan 2017 12:00:00 E-GP Link

Construction of School building ( 5 Storied Building 1040.9 SQM Per Floor) with all facilities, Septic Tank, Apron, Compound Drain, Boundary Wall, Approach Road, Landscaping, Site development and dismantling, Shahid minar, Guard house and Guardian waiting

24th Nov 2016 17:00:00 26th Dec 2016 17:00:00 E-GP Link

Making Container as a store with installing AC & others related works i,e. MS Rack fabrication, Plywood partition works, Thermal Insulation works, AC installation works, Enamel painting works, Electrical works etc.for Haripur 412 MW CCPP, Narayanganj.

16th Nov 2016 16:30:00 01st Dec 2016 12:00:00 E-GP Link

Procurement of Microfilter (RO microfilter) for WT & accessories for Haripur 412 MW CCPP.

02nd Nov 2016 17:00:00 17th Nov 2016 12:00:00 E-GP Link

Procurement of Industrial Air Filter of GT Air Intake System for Haripur 412 MW CCPP, EGCB Ltd., Narayanganj, Bangladesh

01st Nov 2016 12:00:00 13th Dec 2016 15:00:00 Details

Maintenance of Hydraulic pump of Mobile Crane (Model RT 630C) of Siddhirganj 2x120 MW PPP

31st Oct 2016 16:00:00 15th Nov 2016 11:00:00 E-GP Link

Procurement of Sodium hypochlorite, Caustic soda, Hydrochloric acid, Sulfuric acid etc. under Framework Contract for a period of one (1) year for Haripur 412 MW CCPP, Haripur, Bandar, Narayanganj.

30th Oct 2016 17:00:00 28th Nov 2016 12:00:00 E-GP Link

Procurement of Expansion (Flexible) Joint for the Exhaust duct of Gas Turbine unit of Siddhirganj 2x120 MW PPP

30th Oct 2016 15:00:00 14th Nov 2016 11:00:00 E-GP Link

Room partition works of admin building ground floor and construction of Boundary wall for Local control Room-1&2 of Siddhirganj 2x120 MW PPP

27th Oct 2016 19:30:00 13th Nov 2016 10:30:00 E-GP Link

Procurement of Nitrogen Gas (Refilling Nitrogen gas in Cylinder) for Haripur 412 MW CCPP

25th Oct 2016 17:00:00 13th Nov 2016 12:00:00 E-GP Link

Procurement of Walkie-Talkie (UHF Walkie Talkie Radio set) with Govt. Licence for Haripur 412 MW CCPP

23rd Oct 2016 18:00:00 08th Nov 2016 12:00:00 E-GP Link

Supply, Installation, Testing and Commissioning of Draw out unit of 6.6KV incomer Breaker for Haripur 412MW CCPP.

19th Oct 2016 12:00:00 17th Nov 2016 12:00:00 E-GP Link

IT equipment like computer accessories, network routers and switches, optical fiber equipments etc.

17th Oct 2016 12:00:00 02nd Nov 2016 12:00:00 E-GP Link

Procurement of tonner for the photocopier of Mechanical Maintenance Division of Siddhirganj 2x120 MW PPP

16th Oct 2016 16:00:00 06th Nov 2016 12:00:00 E-GP Link

Almira(Steel), File Cabinet(Steel), Multipurpose Self, Revolving Chair, wating Chair, Class Room Chair.

09th Oct 2016 15:00:00 24th Oct 2016 12:00:00 E-GP Link

Physical service for different tests of transformer oil for Haripur 412 MW CCPP like DGA, Neutralization Test, Power dissipation factor, Resistivity, Specific gravity etc.

09th Oct 2016 12:00:00 26th Oct 2016 12:00:00 E-GP Link

Repairing, Maintenance and Servicing works for HVAC system of Haripur 412MW CCPP

09th Oct 2016 12:00:00 27th Oct 2016 12:00:00 E-GP Link

Laptop Computer (Brand)

09th Oct 2016 11:00:00 27th Oct 2016 12:00:00 E-GP Link

Procurement of Dedicated Data Connectivity Service among Data Centre, Corporate Office, Siddhirganj 2x120 MW PPP, Haripur 412 MW CCPP and Siddhirganj 335 MW CCPP Project.

06th Oct 2016 19:00:00 23rd Oct 2016 11:00:00 E-GP Link

Procurement of Motor bearing of Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd.

05th Oct 2016 13:31:00 20th Oct 2016 12:31:00 E-GP Link

Procurement of Consumable goods and domestic electrical goods(light, fan, blast) for Electrical Maintenance Division for Haripur 412 MW CCPP.

05th Oct 2016 12:00:00 24th Oct 2016 12:00:00 E-GP Link

Procurement of Tools for Electrical Maint. Division for Haripur 412 MW CCPP.

05th Oct 2016 12:00:00 24th Oct 2016 12:00:00 E-GP Link

Supply, installation and commissioning of Security light, Garden light, PFI unit with related electrical works at residential area for Haripur 412 MW CCPP.

05th Oct 2016 12:00:00 24th Oct 2016 12:00:00 E-GP Link

Sweeping, Cleaning and Gardening at Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.

03rd Oct 2016 23:45:00 18th Oct 2016 11:15:00 E-GP Link

Procurement of safety items (safety shoes, hand gloves, helmet, ear plug, chemical shute , fire shute etc.), rain coat, torch light and others consumable for Operation Division of Haripur 412 MW CCPP, Haripur, Bandar, Narayanganj.

28th Sep 2016 16:00:00 16th Oct 2016 12:00:00 E-GP Link

Procurement of Gas Turbine Compressor washing chemical / detergent for Haripur 412 MW CCPP, Haripur, Bandar, Narayanganj.

28th Sep 2016 16:00:00 20th Oct 2016 12:00:00 E-GP Link

Procurement of Welding machines, welding accessories, argon,oxygen,acytilne etc. gas cylinder, gas cutter accessories, workshop tools and accessories, Mobile Crane tools etc. for Haripur 412 MW CCPP

28th Sep 2016 14:00:00 17th Oct 2016 12:00:00 E-GP Link

Printing of five hundred (500) pieces of Annual Report for EGCB Ltd.

26th Sep 2016 12:00:00 05th Oct 2016 12:00:00 Details

Procurement of Consumables for I&C maintenance Division

24th Sep 2016 12:00:00 03rd Oct 2016 12:00:00 Details

RFQ document for procurement of cosumables for EMD of Haripur 412MW CCPP

19th Sep 2016 12:00:00 26th Sep 2016 12:00:00 Details

RFQ document for procurement of Safety items for EMD of Haripur 412MW CCPP

19th Sep 2016 12:00:00 27th Sep 2016 12:00:00 Details

Procurement of Office Stationary ( Paper, pen,guard file, register,toiletries etc). for Haripur 412 MW CCPP.

05th Sep 2016 16:00:00 22nd Sep 2016 12:00:00 E-GP Link

Procurement of pipes, fittings, elbow, full coupling, shaft, small valves, flange, nut bolts etc. for Haripur 412 MW CCPP, Narayanganj.

28th Aug 2016 16:00:00 08th Sep 2016 12:00:00 E-GP Link

Construction of temporary fencing periphery wall, gates etc. for 5.52 acre Land under Haripur 412 MW CCPP

16th Aug 2016 16:30:00 31st Aug 2016 12:00:00 E-GP Link

Request for Quotation for 12 Mbps Bandwidth Radio Link Internet Connection for a year at Haripur 412 MW CCPP

16th Aug 2016 12:00:00 24th Aug 2016 12:00:00 Details

Procurement of Activated Alumina for Air Dryer and Carbon Molecular Sieves for Nitrogen generating plant of Siddhirganj 2x120 MW Peaking Power Plant.

12th Jul 2016 18:00:00 28th Jul 2016 11:30:00 E-GP Link

Procurement of different types of valves and other equipment for Siddhirganj 2x120 MW Peaking Power Plant.

10th Jul 2016 17:00:00 25th Jul 2016 12:00:00 E-GP Link

Procurement of Air Conditioner Servicing Under Annual Maintenance Contract of Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd.

20th Jun 2016 12:30:00 11th Jul 2016 12:30:00 E-GP Link

Auction of Scrap Air Intake Filter for One (01) year of Siddhirganj 2x120 MW PPP, Siddhirganj, Narayanganj

16th Jun 2016 12:00:00 23rd Jun 2016 12:00:00 Details

Civil Maintenance (Painting of Building & others; Building Painting, Roof Patent Stone of Workshop and store at Siddhirganj 2x120 MW Peaking Power Plant).

12th Jun 2016 16:00:00 27th Jun 2016 11:00:00 E-GP Link

Supply, Installation and Commissioning of Access Control/Time Attendance System for the Corporate Office, Siddhirganj 2x120 MW PPP & Harinur 412 MW CCPP of EGCB Ltd.

06th Jun 2016 11:00:00 21st Jun 2016 12:00:00 E-GP Link

Supply, Installation and Commissioning of Access Control/Time Attendance System for the Corporate Office, Siddhirganj 2x120 MW PPP & Harinur 412 MW CCPP of EGCB Ltd.

06th Jun 2016 11:00:00 21st Jun 2016 12:00:00 E-GP Link

Procurement of different types of Bearing for Siddhirganj 2x120 MW Peaking Power Plant.

05th Jun 2016 07:00:00 20th Jun 2016 11:00:00 E-GP Link

Procurement of Security Guard Services for Corporate Office of Electricity Generation Company of Bangladesh Ltd.

12th May 2016 12:00:00 19th May 2016 12:00:00 Details

Purchase of consumable goods & necessary materials for I&C related HGPI works of unit-1 of Siddhirganj 2x120 MW Peaking Power Plant, Siddhirganj, Narayanganj.

25th Apr 2016 10:00:00 11th May 2016 09:00:00 Details

Repair & Maintenance Works of Balance of Plant Equipment & Machineries during unit#01 of Siddhirganj 2x120 MW PPP, Siddhirganj, Narayanganj

18th Apr 2016 08:00:00 02nd May 2016 17:00:00 Details

Auction of Scrap Air Intake Filter of Siddhirganj 2x120 MW Peaking Power Plant, Siddhirganj, Narayanganj

13th Apr 2016 09:00:00 28th Apr 2016 15:00:00 Details

Procurement of stationery goods and different types of toners under Framework Contract for a period of one (01) year for Corporate Office of EGCB Ltd., Dhaka.

12th Apr 2016 12:00:00 27th Apr 2016 12:00:00 Details

Procurement of Outdoor Light and Electrical spares for plant and colony of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

10th Apr 2016 08:00:00 17th Apr 2016 11:00:00 Details

Procurement of Outdoor Light and Electrical spares for plant and colony of Siddhirganj 2x120MW Peaking Power Plant, EGCB Ltd.

06th Apr 2016 08:00:00 21st Apr 2016 11:00:00 Details

Major Maintenance of 02(two) nos Fork Lift (1.5 ton & 3 ton) of Siddhirganj 2x120 MW Peaking Power Plant., Siddhirganj, Narayanganj

31st Mar 2016 09:00:00 17th Apr 2016 15:00:00 Details

Procurement of Different types of Belts for Siddhirganj 2x120 MW Peaking Power Plant, Narayanganj-1430, Siddhirganj, Narayanganj

28th Mar 2016 08:00:00 12th Apr 2016 12:00:00 Details

Repair & Maintenance of Mobile Crane (25 Ton, Model: RT630 C) of Siddhirganj 2x120 MW Peaking Power Plant, Siddhirganj, Narayanganj-1430, Siddhirganj, Narayanganj

28th Mar 2016 08:00:00 12th Apr 2016 12:00:00 Details

Renewal of Existing Domain Name and Procurement of the Dynamic Website Hosting Space for EGCB Ltd., Dhaka.

06th Mar 2016 08:00:00 10th Mar 2016 12:00:00 Details

e-Tender Notice in the National e-GP System portal of Siddhirganj 2x120 MW PPP, Siddhirganj, Narayanganj

28th Feb 2016 08:00:00 14th Feb 2016 15:00:00 Details

Auction notice for Haripur 412 MW CCPP, Haripur, Narayanganj

24th Feb 2016 10:00:00 08th Feb 2016 15:00:00 Details

Repair and Testing of Damaged Starting Motor for Siddhirganj 2x120MW Peaking Power plant, EGCB Ltd, Siddhirganj, Narayanganj-1430

04th Feb 2016 10:00:00 11th Feb 2016 15:00:00 Details

Procurement of Desktop Computer, Printer (Heavy Duty and Multifunction type), Scanner and UPS.

26th Jan 2016 10:00:00 10th Feb 2016 12:00:00 Details

Procurement of Conference System.

21st Jan 2016 16:00:00 07th Feb 2016 12:00:00 Details

Procurenent of HGPI works for Unit-01

19th Jan 2016 10:00:00 01st Feb 2016 15:00:00 Details

Inspection of No. 01 & 03 Bearing & Replacement of 04 Nos. bearing Thermocouple work of Unit-01 of Siddhirganj 2x120 MW PPP, Siddhirganj, Narayanganj, Bangladesh

19th Jan 2016 10:00:00 01st Feb 2016 15:00:00 Details

Ptocurerlent of Videoscope (Borescopc with video facility) for Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Haripur Bandar, Narayanganj, Bangladesh.

13th Jan 2016 10:00:00 24th Feb 2016 15:00:00 Details

Stall Decoration, Dcumentary Preparation & Associates Works for Electricity Week-2015 of EGCB Ltd., Dhaka.

05th Nov 2015 15:23:00 31st Jan 2016 15:03:00 Details

Pkg-1:-Cleaning works of GT Primary Air Intake Filter end GT Air intake Filter replacement works of Siddhirgonj 2xI 20 MW PPP.

31st Oct 2015 10:00:00 16th Nov 2015 12:00:00 Details

Procurement of Multimedia Projector with Screen, Hanging Tool. Associate Accessories and Conference System for Corporate Office of EGCB Ltd., Dhaka.

27th Oct 2015 10:00:00 10th Nov 2015 15:00:00 Details

Procurement of works (Package-2) & Goods (Package-1,3 & 4)(Single Lot) for Haripur 412 MW CCPP, EGCB Ltd.

26th Oct 2015 11:00:00 15th Nov 2015 15:00:00 Details

Ex_Summary Final_IEE_ Pekua Pekua Coal Based Power Plant_2015

25th Oct 2015 15:00:00 04th Nov 2015 15:39:00 Details

Addendum (No.-02) of Procurement of Primary and Secondary Air Intake Filters for Gas Turbine (GE Model: PG-9l7l-E) of Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Narayanganj, Bangladesh.

14th Oct 2015 11:00:00 03rd Nov 2015 15:00:00 Details

Auction for the useless goods and furnitures of the old corporate office(BTMC Bhaban, 8th Floor, Kawran Bazar) of Electricity Generation Company of Bangladesh Limited.

15th Sep 2015 11:00:00 20th Sep 2015 15:41:00 Details

Repairing, Maintenance and Servicing of Air-Conditioning System for 01 (One) year of Haripur 412 MW CCPP, EGCB Ltd.

07th Sep 2015 10:00:00 21st Sep 2015 15:45:00 Details

Making an Architectural model of 02 (two) Power Plants of EGCB Ltd.

06th Sep 2015 12:00:00 15th Sep 2015 15:43:00 Details

Procurement of Primary and Secondary Air Intake Filters for Gas Turbine (GE Model: PG-9171-E) of Siddhirganj 2x120 MW PPP, EGCB Ltd., Narayanganj, Bangladesh.

02nd Sep 2015 11:00:00 18th Oct 2015 15:47:00 Details

Inspection of No 1 Bearing & placement of 02 Nos trust bearing thermocouple work without demantling Inlet casting, Inlet Elbow of Unit#2 (GE frame 9E GT) at Siddhirganj 2x120 MW Peaking Power plant, EGCB, Siddhirganj, Narayanganj-1430

22nd Jul 2015 12:00:00 23rd Jul 2015 15:00:00 Details

LOT-1: Hiring of Manpower for HGPI works for Unit#2 of Siddhirganj 2x120 MW Peaking Power Plant, Siddhirganj, Narayanganj. LOT-2: Repair & Maintenance works of Unit#2 during HGPI of Siddhirganj 2x120 MW Peaking Power Plant, Siddhirganj, Narayanganj.

16th Jul 2015 15:50:00 26th Jul 2015 15:50:00 Details

Amendment notice of Supply & Installation of ERP & EAM system for Electricity Generation Company of Bangladesh (EGCB) Ltd. IFB No: W-1009 Date: 27 April 2015 (Project: P095965 - BD: Siddhirganj Power Project, Bid: EGCB-G2: ERP & EAM)

29th Jun 2015 11:21:00 22nd Jul 2015 15:00:00 Details

ADDENDUM NO-02 FOR INTERNATIONAL BIDS, SIDDHIRGANJ 335 MW CCPP PROJECT

25th Jun 2015 11:19:00 01st Jul 2015 15:00:00 Details

"Operation and Maintenance Services of Siddhirganj 335 MW Combined Cycle Power Plant, Narayanganj, Bangladesh"

25th Jun 2015 11:00:00 01st Jul 2015 15:00:00 Details

Procurement of Mist Eliminator Filter Element and GT Lube Oil Filter Element for Siddhirganj 2x120 Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh

24th Jun 2015 11:23:00 09th Aug 2015 15:00:00 Details

Repair and Testing of Damaged Starting Motor for Siddhirganj 2x120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj-1430

12th Jun 2015 11:00:00 27th Jun 2015 15:00:00 Details

Procurement of Brand new latest model Car with Petrol/Gasoline Engine and CNG Cylinder and catalytic converter, volume capacity 1300±5% CC, 4 Doors, 5 Seater (Including Driver).

07th Jun 2015 11:26:00 22nd Jun 2015 15:00:00 Details

Pkg-1: Procurement of I&C spares for IA/PA/N2 Plant Pkg-2: Procurement of CW Module Pamp Strainer Element & Net Pkg-3: Procurement of CW Module Fan Belt For Siddhirganj 2x120 Peaking Power Plant, Siddhirganj, Narayanganj

28th May 2015 11:00:00 10th Jun 2015 15:00:00 Details

Addendum Notice

25th May 2015 10:00:00 22nd Jun 2015 15:00:00 Details

"Supply & Installation of an Enterprise Resource Planning (ERP) and Enterprise Asset Management (EAM) System"

27th Apr 2015 11:00:00 15th May 2015 15:00:00 Details

Procurement of Dynamic and Interactive Website for Electricity Generation Company of Bangladesh Ltd.

03rd Apr 2015 11:00:00 12th Apr 2015 15:00:00 Details

Auction Notice from Haripur 412 MW CCPP, EGCB Ltd., Haripur, Narayanganj, Bangladesh.

28th Feb 2015 12:11:00 15th Mar 2015 12:11:00 Details

Procurement of different types of Transmitters and Calibration Instruments for GT, GBC & BOP units of Siddhirganj 2×120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.

20th Feb 2015 11:00:00 05th Apr 2015 15:00:00 Details

Procurement of different types of Transmitters and Calibration Instruments for GT, GBC & BOP units of Siddhirganj 2×120 MW Peaking Power Plant, EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh.

19th Feb 2015 13:09:00 05th Apr 2015 13:10:00 Details

Addendum of Tender Document "Procurement of different types of Transmitters and Calibration Instruments for GT, GBC & BOP units of Siddhirganj 2x120 MW Peaking Power Plant., EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh."

19th Feb 2015 11:00:00 28th Feb 2015 15:00:00 Details

Addendum of Tender Document "Procurement of different types of Transmitters and Calibration Instruments for GT, GBC & BOP units of Siddhirganj 2x120 MW Peaking Power Plant., EGCB Ltd., Siddhirganj, Narayanganj, Bangladesh."

19th Feb 2015 11:00:00 28th Feb 2015 15:00:00 Details

Procurement of Stationary Goods & different types of toners under framework contract.

18th Feb 2015 11:00:00 04th Mar 2015 15:00:00 Details

Addendum of Tender Document "Procurement of Stationary goods, different types of toners under framework contract for Corporate Office of EGCB Ltd., Dhaka"

17th Feb 2015 12:07:00 27th Feb 2015 12:08:00 Details

Package-l: Procurement of Office Furniture for Haripur 412 MW CCPP of EGCB Ltd. Package-2: Procurement of Safety Equipment for Haripur 412 MW CCPP of EGCB Ltd.

17th Feb 2015 11:00:00 09th Mar 2015 15:00:00 Details

Package-l: Procurement of Office Furniture for Haripur 412 MW CCPP of EGCB Ltd. Package-2: Procurement of Safety Equipment for Haripur 412 MW CCPP of EGCB Ltd.

17th Feb 2015 11:00:00 09th Mar 2015 15:00:00 Details

Construction of Internal Road, Garage.facilities, Boundary Walt & Security post, Drainage sysfem and Landscaping at Residential Area under Haripur 412 MW CCPP Proiect, EGCB Ltd.

10th Feb 2015 13:12:00 23rd Feb 2015 15:00:00 Details

Procurement of 01 (one) no. Brand New Double Cabin Pickup & 01 (one) no. Fork Lift with all necessary accessories for Haripur 412 MW CCPP of EGCB Ltd.

27th Jan 2015 11:00:00 15th Feb 2015 15:00:00 Details

Verticle Extension Work (1st Floor to 2nd Floor) of Administration Building of Haripur 412 MW Combined Cycle Power Plant, EGCB Ltd., Haripur, Bandar, Narayanganj, Bangladesh.

23rd Jan 2015 11:00:00 15th Feb 2015 15:00:00 Details