Siddhirganj 2x120 MW Peaking Power Plant

Siddhirganj, Narayanganj.

31st Jan 2007

16th Jun 2007

Natural Gas

05th Feb 2012

108.48 Million USD+353.20 Million BDT

Asian Development Bank (ADB), GOB.


Bharat Heavy Electricals Limited (BHEL), India.

211.76 MW (2 x 105.88 MW)

Electricity Generation Company of Bangladesh Ltd.

0.00  Taka

77,000.00  Taka

47,563.00  Taka

124,563.00  Taka

1GT:1GT

Search

SIDDHIRGANJ 2×120MW PEAKING POWER PLANT PROJECT

The construction of Siddhirganj 2×120 MW Peaking Power Plant Project has been completed on the bank of the river Shitalakhya within the Siddhirganj power station premises funded by Asian Development Bank.

Electricity Generation Company of Bangladesh Limited signed a contract with Bharat Heavy Electricals Limited (BHEL) as EPC contractor for the above project on 31 January, 2007. 1st Unit was put on test run on 20 November, 2009 and it was inaugurated by the Honorable Prime Minister on 14 February, 2010. The 2nd Unit was put on test run on 26 May, 2010. The 2nd Unit was taken over from the EPC contractor on October 14, 2010. COD of both units was effective from February 5, 2012.

GT: 2 GT, 209.5437 MW (net), BHEL, India.
GT Generator 2 GTG, 135 MVA (each), BHEL, India.
GBC 3 Nos., Model: BCL406, BHEL, India.
Transformer 2 Nos., 170MVA (each), BHEL, India.
Thermal Efficiency 31% (Approx)
No. of Unit 2 (Two)

Inaugurated by

Honorable Prime Minister (Unit - 1)

14 February, 2010

Land Lease Agreement

Land Lease Agreement was signed between EGCB Ltd. & BPDB on 29 August, 2011 for 4.17 acres of land at Siddhirganj power station area on rental basis for the period of 23 years.

Power Purchase Agreement

A Power Purchase Agreement (PPA) for 2x120 MW Peaking Power Plant at Siddhirganj was signed between EGCB Ltd. and BPDB on 29 August, 2011 for the period of 22 years.

NTPC, India is the O&M contractor of the plant. Contract was signed on 13-12-2011 and was effective on 01-10-2012.


14 LTSA Long Term Service Agreement (LTSA) signed on 31-10-2013 for a

period of six (6) years with (1) BHEL, India for Generation and BOP

portion and with (2) BGGTS for CI/HGPI/MI of GT portion.